CAJA RURAL DE TENERIFE HEADOFFICE BUILDING
(TENERIFE)


On this project we install second "glass skin" over existent fašade. Between main fašade and this second "glass skin" we install steel boardwalk 80cm wide for maintenance/cleaning purposes. Challenge was to design, manufacture and install the whole set. To do this we used aluminium special columns COLUMNFIX and the GVMA-20 stainless steel spiders (glass fittings).

Used glass was clear tempered and laminated 8+8mm with special dot silkprint.

Destacable fact this second "glass skin" endured, without any damage, tropical storm "Delta", who caused big damages around all Tenerife island, as well as, collapsing some electrical towers. This was best "field test" for our designs and systems.


On the following link real project pictures made with this design can be seen.


(Select any image to see zoomed on a new window)